TRIBAL WEBSITE          INTRANET LOGIN
MENU
Header
Water Resources Department

Water Resources Department

News

Piezometer Project >

11/01/2014

11/1/2014
 

 

Piezometer Project on the Grand River 

piezometer

The piezometers are set to measure groundwater elevations and establish the relationship between groundwater and surface water elevations in the the Grand River. The piezometers will be routinely visited to measure the groundwater level and the surface water level in the Grand River. This project is for two years. 

There are 2 (two) piezomenter locations on the Grand River. Each site has 6 (six) piezometers. 

Fence protecting piezometer

Miles Gipp and Tyrone Cadotte, Sr. installing a fence to protect the piezometers from livestock and other animals. (above)

finished fence

Tyrone Cadotte with a finished fence for a piezometer. (above) 

Garrison Dam/Lake Sakakawea Project Final Surplus Water Report >

11/20/2012

 Garrison Surplus Report.pdf

Chatfield Reservoir Storage Relocation >

11/20/2012

6/1/2012

 Chatfield Reservoir Storage Relocation.pdf

Missouri River Municipal & Industrial Water Storage Reallocation Study >

11/20/2012

8/1/2012

 Missouri MR&I Relocation Study.pdf

Gavins Point Dam/Lewis and Clark Lake Project Draft Surplus Water Report >

11/20/2012

8/1/2012

 Gavins Point Surplus Report.pdf
 

Fort Randall Dam/Lake Francis Case Project Draft Surplus Water Report >

11/20/2012

8/1/2012

 Fort Randall Surplus Report.pdf

Fort Peck Dam/Fort Peck Lake Project Draft Surplus Water Report >

11/20/2012

8/1/2012

 Fort Peck Surplus Report.pdf
 

Big Bend Dam/Lake Sharpe Project Draft Surplus Water Report >

11/20/2012

8/1/2012

 Big Bend Surplus Report.pdf

Oahe Dam/Lake Oahe Project Draft Surplus Water Report >

11/20/2012

8/1/2012

 oahe surplus report.pdf

CONTACT

No Contact Info Available